Water treatment plant Horní Planá – 15 l/s

Year of installation: 2018
Client: ČEVAK, a.s.
Planner: ENVI-PUR, s.r.o.
Operator: ČEVAK, a.s.

The technological delivery at the Horní Planá WTP consisted in the installation of two lines of open stainless steel filters, into which the Leopold drainage system (8 m2) was installed. Filtralite FMM was chosen as the filter material.

Due to space constraints, the stainless steel filters were welded on site and the entire assembly took place during uninterrupted operation of the water treatment plant.