WWTP Vrané nad Vltavou 5360 PE

Reconstruction of the municipal WWTP
Year of installation: 2021
Client: GEOSAN GROUP a.s., SMP CZ, a.s.
Planner: D-Plus project and engineering a.s.

The reconstruction of the municipal WWTP Vrané nad Vltavou consisted of a complete replacement of the technological system, including electrical wiring installation, metering and regulations. We disassembled the old technology and newly installed the mechanical pre-treatment, biological treatment tanks, blower and sludge dewatering machine. Technology for removal of increasing phosphorus has also been installed. All ongoing work was carried out during running of the WWTP.